The first big update from the Nova Scotia build, including photos and layout of the property.
This is part 1 of my Nova Scotia build series, where I document every step of building my own eco-friendly home. Continue to Build Update 2 →(/blog/build-update-2-prepping-driveway-slab-sites) --- Build Update 1: Site Prep, Ordering Materials, and Finalizing Drawings and Layout Site Prep The lot I'm building on is 1.3 acres, alongside a county road. It wasn't accessible until last fall, when we had a culvert installed—a bit of an endeavour itself—as there's a stream that runs along the perimeter and then diagonally through the property. Last year, the only real work that was done was the installation of this culvert in September, as well as some tree clearing. The major remaining parts before building are: Ditching of two sides of the property to prevent water gathering in low areas Preparation of both shed sites, one of which will become an office long-term, and one of which will serve as the power/utility hub for the property Filling in of the test hole dug for septic planning Bonus ...
← Back to all articles